The Master Plan brings with it many benefits to the Coronado community.

Main Entry
OPENING LATE 2021
Hotel del Coronado is restoring its bygone sense of arrival with a new landscaped entry featuring a grand view of the iconic red turret. The lush driveway will harken back to the Victorian era with a new front façade inspired by the property’s original front porch and wide veranda featuring two sets of entry stairs.

Parking Improvements
NORTH SIDE 2019 | SOUTH SIDE 2021
Upon completion, the majority of resort parking will be located underground, with two new underground parking structures, one below the Conference Center and one on the north side of the property, totaling 1,179 parking spaces (239 more spaces). The new north parking structure will be completed mid November 2019. Upon completion, the north entry will serve as the resort’s temporary main entrance as construction on the south side of the property commences.

Orange Avenue Improvements
OPENING LATE 2021
Street improvements along Orange Avenue will include a new landscaped sidewalk for an enhanced pedestrian experience and landscaped medians.

Avenida del Sol Improvements
OPENING LATE 2021
Public improvements will include a new signalized intersection and pedestrian crosswalk to the bay, with a landscaped sidewalk and new angled parking. The existing beachfront walkway will be extended around the cul-de-sac and the existing stairs will be replaced with an access ramp.